Files
L-Ami-Fiduciaire/_bmad/tea/workflows/testarch/test-design/test-design-handoff-template.md
Saad Ibn-Ezzoubayr 35545c2a8f feat: L'Ami Fiduciaire V1.0.0 — full codebase with Story 0.1 complete
Initial commit of the L'Ami Fiduciaire SaaS platform built on Laravel 12,
Vue 3, Inertia.js 2, and Tailwind CSS 4.

Story 0.1 (rename folders to declarations in database) is implemented and
code-reviewed: migration, rollback, and 6 Pest tests all passing.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-11 23:33:10 +00:00

3.1 KiB
Raw Blame History

title, version, workflowType, inputDocuments, sourceWorkflow, generatedBy, generatedAt, projectName
title version workflowType inputDocuments sourceWorkflow generatedBy generatedAt projectName
TEA Test Design → BMAD Handoff Document 1.0 testarch-test-design-handoff
testarch-test-design TEA Master Test Architect {timestamp} {project_name}

TEA → BMAD Integration Handoff

Purpose

This document bridges TEA's test design outputs with BMAD's epic/story decomposition workflow (create-epics-and-stories). It provides structured integration guidance so that quality requirements, risk assessments, and test strategies flow into implementation planning.

TEA Artifacts Inventory

Artifact Path BMAD Integration Point
Test Design Document {test_design_path} Epic quality requirements, story acceptance criteria
Risk Assessment (embedded in test design) Epic risk classification, story priority
Coverage Strategy (embedded in test design) Story test requirements

Epic-Level Integration Guidance

Risk References

Quality Gates

Story-Level Integration Guidance

P0/P1 Test Scenarios → Story Acceptance Criteria

Data-TestId Requirements

Risk-to-Story Mapping

Risk ID Category P×I Recommended Story/Epic Test Level
  1. TEA Test Design (TD) → produces this handoff document
  2. BMAD Create Epics & Stories → consumes this handoff, embeds quality requirements
  3. TEA ATDD (AT) → generates acceptance tests per story
  4. BMAD Implementation → developers implement with test-first guidance
  5. TEA Automate (TA) → generates full test suite
  6. TEA Trace (TR) → validates coverage completeness

Phase Transition Quality Gates

From Phase To Phase Gate Criteria
Test Design Epic/Story Creation All P0 risks have mitigation strategy
Epic/Story Creation ATDD Stories have acceptance criteria from test design
ATDD Implementation Failing acceptance tests exist for all P0/P1 scenarios
Implementation Test Automation All acceptance tests pass
Test Automation Release Trace matrix shows ≥80% coverage of P0/P1 requirements